The Texas Rangers are a 60-year-old Major League Baseball team that needed a new home. In 2016, the team announced they would build a brand new stadium through a public/private partnership between the City of Arlington and the Rangers. The new 1.7 million-ft² 41,000-seat ballpark would provide a permanent site for home games, as well as a multipurpose sports and entertainment venue for the community.

Designers originally wanted to use hand-laid brick for the north façade. However, the contractor emphasized early on that 100% hand-laid brick would not be possible with the construction schedule.

As an alternative, they split up the brickwork, using precast concrete on the exterior of the façade and hand-laid on the interior. They selected a thin-brick version of the same full brick that was being used throughout the ballpark and cast them into the precast concrete column wrap units, which were eventually lifted into place and hung from the steel structure.

“From the start of design, Fred Ortiz [of HKS] challenged us to ‘think outside the box’ on the finishes for the exterior of the non-brick-clad areas,” says John Arehart, vice president of the architectural division for Enterprise Precast Concrete.

The design team ultimately selected a distressed finish that simulates aged travertine by incorporating three finishes at varying widths and depths within a 15 × 30 ft panel. “The level of exterior texture gave the façade a travertine look, but in more monolithic, large, random blocks,” says Fred Ortiz, director of sports and principal at HKS. “Instead of being consistent, it was consistently inconsistent, and that worked for the betterment of the project.”

Because the masonry in the north arcade was part of the same arch element, the precast concrete producer had to work closely with the masonry company and the contractor to ensure that similar masonry color and coursing complemented the hand-laid brick on the interior face of the arches for a cohesive aesthetic. “The precast concrete brick-clad columns and arches now read as one singular element, thanks to the collaborative efforts of the design and construction teams,” Arehart says.

Retractable Roof

One of the most important features in the design is a massive retractable roof that can be opened and closed based on the weather. In the old stadium, extreme heat or rain were often cited as reasons why attendance was lower than in other baseball stadiums. The retractable roof, which rolls onto a steel frame with decorative thin-brick precast concrete arches, solved this issue, Arehart says. “The roof introduces a fully climate-controlled atmosphere, a first of its kind in a Major League Baseball facility.”

To meet the tight schedule, which was set to accommodate the 2020 baseball season, the project team was able to speed erection through the shared use of cranes and having the precast concrete set overnight to avoid conflicts with other trades. A second PCI-Certified producer was brought in to provide 1650 structural components in the stadium, including risers, raker beams, columns, beams, and interior structural walls. Cooperation and collaboration between the two different precast concrete producers, who are typically competitors in this market, was essential to the project’s success.

As a result, the project was delivered on time, and was tapped to host the 2020 World Series, but because of the pandemic, the fans haven’t yet had a chance to experience the beauty of this new ballpark. “Sitting in the empty stands … is a strange experience,” Ortiz says. “You hear so many more nuances of the game, like voices, and the clear crack of the bat. But we are all ready for baseball to be back.”

 

Awards_
2021 PCI Design AwardsBuilding Award: Best Stadium and Arena
Project Team

Owner:

Texas Rangers, the City of Arlington, and Globe Life, Arlington, Tex.

PCI-Certified Precast Concrete Producer and Precast Concrete Specialty Engineer:

Enterprise Precast Concrete, Corsicana, Tex. 

PCI-Certified Precast Concrete Producer:

Gate Precast Company, Hillsboro, Tex.

Architect:

HKS, Dallas, Tex.

Engineer of Record:

Walter P. Moore, Dallas, Tex.

General Contractor:

Manhattan Construction, Dallas, Tex.

PCI-Certified Erector:

Precast Erectors, Hurst, Tex.

Photo Credit:

Enterprise Precast Concrete and Jacia Phillips | Arch Photo KC

Project Cost:

$1.2 billion

Project Size:

1.7 million ft2

Key Project Attributes

  • Thin-brick inlays mimic the appearance of hand-laid brick at a fraction of the cost.
  • A distressed travertine look was achieved by incorporating three finishes in 1-in. increments within the panels.
  • The retractable roof rolls onto a steel frame with decorative thin-brick precast concrete arches.

Project/Precast Scope

  • Build a 1.7 million-ft² baseball field for the Texas Rangers.
  • The project included approximately 114,000 ft² of finished precast concrete.
  • Precast concrete erection was completed from October 2018 through April 2019.