Architect
Leo A Daly, Minneapolis, Minn.
Engineer
Leo A Daly, Minneapolis, Minn.
General Contractor
Clayco Construction, St. Louis, Mo.
Owner
Dollar General, Goodlettsville, Tenn.
Precaster
Metromont Corporation, Hiram, Ga.
Precast Specialty Engineer
Architectural Polymers, Palmerton, Pa.
Key Project Attributes
- Fabricating the precast concrete components under controlled conditions in the plant ensured high quality and tight tolerances, minimizing field adjustments and speeding up erection time.
- Casting components off-site while site work was completed allowed precast concrete pieces to be ready for erection as soon as foundations were ready, speeding up construction.
- Precast concrete’s aesthetic versatility provided a distinctive, customized look with formliners that related to the employee’s activities.
- Reusable formliners cut costs on casting while boosting aesthetics.
- Pattern was linked from panel to panel to create seamless design around the building.
Project/Precast Scope
- 960,000-square-foot distribution warehouse with attached employee hub.
- Hub includes locker rooms, restrooms, large vending aera, 20 glass-fronted commercial-grade refrigerators, 600-person cafeteria, and an elevated sky bridge.
- 450 load-bearing panels.
- Typical panels were 13’6” wide by 47 feet tall, with some smaller and larger widths and heights as needed.
|