Proj Overview

Opaque spandrel glass elegantly framed by Silver Shadow stone draws eyes toward this eight-story corporate center, beautifully reflecting the picturesque upper Midwest skies that grace downtown Minneapolis. The $125 million headquarters for a Fortune 500 financial services organization connects downtown Minneapolis’ emerging eastern core with the growing Elliot Park and East Town neighborhoods.

A two-story pavilion at the base of the main tower welcomes residents and visitors into a spacious lobby, which features a café, a chapel/meditation room, and an art gallery. The public areas tap into the city’s downtown skyway system from the second floor, and an all-glass eight-story stair tower encourages connection and ongoing collaboration among more than 1,000 employees.

The architect and contractor considered multiple glass and metal panel options during the design phase but chose precast concrete for its cost-effective value and durability. The Gage Brothers design assistance team connected the architect with various suppliers to find the perfect stone, even arranging a private tour of the stone quarry so the architect could select the exact color and texture desired.

Gage Brothers provided nearly 23,000 square feet of insulated precast concrete panels for the project, including special L-shaped pieces offering smooth corners without the need for caulking. “Insulated precast panels provided a solid vapor barrier and an all-encompassing building component that eliminated the need for additional sub-contractors while speeding up critical path analyses.” - Bill Blanski, Design Principal, HGA

 

Awards_
There are no records.
Project Team

Architect:

HGA

Engineer:

HGA

Contractor:

McGough Construction

Precaster:

Gage Brothers

PCI Certified Erector:

McGough Construction

Image Credits:

Corey Gaffer © Gaffer Photography

Key Project Attributes

  • Design assist project
  • 2 levels of below-grade parking
  • Shared center court drive
  • Open communicating glass-enclosed stair tower.
  • Special L-shaped precast pieces with smooth corners negating the need for caulking.

Project/Precast Scope

  • Total Project Cost: $125 million
  • Total Project Size: 340,000 SF
  • 243,000 SF and 97,000 SF parking garage
  • 23,000 SF of insulted precast panels